This facility with 4 turbines produces 11% of TVA power. They were currently pumping out upland reservoir to inspect pipes so lake was low. The standpipe is 32' in diameter. The ball valves feeding each turbine are 17' in diameter. The dike on the lake is 8500' long and 200-300' high. The turbines are also reversed to pump water into the upland when the river floods.
An Itasca Sunrise Class A and a G6 exploring America with two juvenile retirees, living the dream.
Thursday, October 29, 2009
Wednesday, October 28, 2009
DeSoto SP Alabama
Tuesday, October 27, 2009
Rainy day in Georgia
We are actually about 5 mile inside Tennessee. Rained all day so took the day off. Cloud cover is at 1000' so can not see the top of Raccoon or Lookout Mountain ridges. They have a reservoir power plant 1100' inside Raccoon Mt. where they pump water for hydroelectric generation when needed. Still learning the ins and outs of RV life. We have now used the convection microwave, gas oven, range top, and outside grill. Camping is a rough life. Here is our living room.
Monday, October 26, 2009
Saturday, October 24, 2009
Russell Cave National Monument
Sears Woods Oct 2009
Subscribe to:
Posts (Atom)